Home
Services
|
Methodology
|
Experience
|
Industry
|
Ask Our Clients
|
Resources
|
OA News
|
Contact Us
Project Histories
>
Operational Layout & Logistics Consulting
Please click on any of the project histories listed below to view detailed information.
All project histories are in Adobe PDF format and require Acrobat Reader to view.
Click here
if you need to download the reader.
Greenfield Lean Manufacturing Plant Supports Mexico Strategy
Manufacturing Plant Design Improves Space Efficiency and Material Flow
Lean Manufacturing Facility Redesign Dramatically Reduces Space, Scrap, and Labor
Supply Chain Strategy Reduces Costs and Improves Customer Service
Prototype Bulk and Route Truck Distribution Center Design Reduces Direct Labor
Distribution Center Redesign Eliminates Outside Storage
Greenfield Lean Manufacturing Facility Minimizes Inventories
Greenfield Distribution Center Design Reduces Space by 25% and Ships 80,000 Lines per Day
Greenfield Asian Manufacturing & Distribution Center Facility Improves Flexibility and Expandability
Parts Distribution Center Redesign Eliminates Need for Facility Expansion
1,000,000 SF Parts Distribution Center Leans on Toyota Production System Design
Simulation Modeling Improves Workcell Design
Warehouse Relocation Plan Reduces Business Risk
Site Master Plan Optimizes Warehousing Processes & Reduces Development Costs
Improved Layout Postpones Need for New Facilities
Facility Master Plan Supports Rapid Growth & Improves Material Flow
Material Handling Design Improves Productivity
Material Handling Design Minimizes New Facility Construction
Process Redesign Improves Reverse Logistics
Work Cell Redesign Reduces Handling Costs & Improves Ergonomics
Work Cell Redesign Improves Safety & Productivity
Material Handling Design Improves Efficiency
Existing Space Utilization Improved to Avoid Expansion
Plant Layout Improves Space Utilization
Plant Layout Improves Work Flow & Reduces Travel Distances
Plant Redesign Improves Process Flow and Minimizes Future Expansion
Mexico Design Leverages Existing Facility to Reduce Costs
Design Improves Space Utilization for Raw Materials and Packaging Warehouse
Master Plan Reduces Size of Planned Expansion by Almost 50%
Greenfield Layout Reduces Space Requirements by 25% and Provides Flexibility for Rapid Growth
Layout Improves Line-Side Storage Utilization and Speeds Replenishment
Lean Logistics Increases Productivity by 63%
Site Logistics Strategy Reduces Inventory Without Impacting Production Efficiency
Distribution Center Redesign Improves Customer Service 87% and Reduces Charge Backs 35% in 6 months
Fast-Track Implementation Supports Peak Shipping Season
Order Picking and Operational Improvements Support Rapid Growth
Process Redesign Reduces Costs by $300,000 per Year
500,000 SF Master Plan Improves Productivity and Postpones Space Needs for 3 Years
Facility Consolidation Reduces Costs and Improves Ergonomics
<
back to Experience
Home
|
Services
|
Methodology
|
Experience
|
Industry
|
Ask Our Clients
|
Resources
|
OA News
|
Contact Us
site design by
solstudio
© 2004 Operations Associates, Inc.