Home Services | Methodology | Experience | Industry | Ask Our Clients | Resources | OA News | Contact Us
 
 
Project Histories
> Operational Layout & Logistics Consulting

Please click on any of the project histories listed below to view detailed information.
All project histories are in Adobe PDF format and require Acrobat Reader to view. Click here if you need to download the reader.

  Greenfield Lean Manufacturing Plant Supports Mexico Strategy
  Manufacturing Plant Design Improves Space Efficiency and Material Flow
  Lean Manufacturing Facility Redesign Dramatically Reduces Space, Scrap, and Labor
  Supply Chain Strategy Reduces Costs and Improves Customer Service
  Prototype Bulk and Route Truck Distribution Center Design Reduces Direct Labor
  Distribution Center Redesign Eliminates Outside Storage
  Greenfield Lean Manufacturing Facility Minimizes Inventories
  Greenfield Distribution Center Design Reduces Space by 25% and Ships 80,000 Lines per Day
  Greenfield Asian Manufacturing & Distribution Center Facility Improves Flexibility and Expandability
  Parts Distribution Center Redesign Eliminates Need for Facility Expansion
  1,000,000 SF Parts Distribution Center Leans on Toyota Production System Design
  Simulation Modeling Improves Workcell Design
  Warehouse Relocation Plan Reduces Business Risk
  Site Master Plan Optimizes Warehousing Processes & Reduces Development Costs
  Improved Layout Postpones Need for New Facilities
  Facility Master Plan Supports Rapid Growth & Improves Material Flow
  Material Handling Design Improves Productivity
  Material Handling Design Minimizes New Facility Construction
  Process Redesign Improves Reverse Logistics
  Work Cell Redesign Reduces Handling Costs & Improves Ergonomics
  Work Cell Redesign Improves Safety & Productivity
  Material Handling Design Improves Efficiency
  Existing Space Utilization Improved to Avoid Expansion
  Plant Layout Improves Space Utilization
  Plant Layout Improves Work Flow & Reduces Travel Distances
  Plant Redesign Improves Process Flow and Minimizes Future Expansion
  Mexico Design Leverages Existing Facility to Reduce Costs
  Design Improves Space Utilization for Raw Materials and Packaging Warehouse
  Master Plan Reduces Size of Planned Expansion by Almost 50%
  Greenfield Layout Reduces Space Requirements by 25% and Provides Flexibility for Rapid Growth
  Layout Improves Line-Side Storage Utilization and Speeds Replenishment
  Lean Logistics Increases Productivity by 63%
  Site Logistics Strategy Reduces Inventory Without Impacting Production Efficiency
  Distribution Center Redesign Improves Customer Service 87% and Reduces Charge Backs 35% in 6 months
  Fast-Track Implementation Supports Peak Shipping Season
  Order Picking and Operational Improvements Support Rapid Growth
  Process Redesign Reduces Costs by $300,000 per Year
  500,000 SF Master Plan Improves Productivity and Postpones Space Needs for 3 Years
  Facility Consolidation Reduces Costs and Improves Ergonomics

 
 

< back to Experience

 
 
  Home | Services | Methodology | Experience | Industry | Ask Our Clients | Resources | OA News | Contact Us
site design by solstudio © 2004 Operations Associates, Inc.